Orb Lab Mesh
Pilot evaluation independent assessment

Service 03 — ¥29,000 JPY · 3 weeks

A second look at your pilot — from outside the supplier relationship

A favourable pilot report from a supplier answers certain questions. What it rarely answers is whether the pilot conditions resembled ordinary operation, or what the cost would be when the system is running at full scale.

A pilot report is one view of what happened — this engagement provides another.

What this engagement delivers

An independent assessment of what your pilot actually showed

After three weeks, you hold three things: an assessment of the measurement method used in the pilot, figures recalculated at operational scale, and a recommendation — which may be to discontinue.

That last point matters. We consider a recommendation to discontinue a complete and acceptable outcome, and we write it in the same plain terms as any other finding.

Assessment of the measurement method

We examine how performance was measured during the pilot — what was counted, what was excluded, and whether the method would produce the same results under different conditions.

Figures recalculated at operational scale

Pilot conditions are rarely identical to full-scale operation. We recalculate the figures using assumptions that reflect how the system would actually run — volume, load, and the edge cases that the pilot did not encounter.

A recommendation that may be to discontinue

The engagement concludes with a written recommendation. Where the recalculated figures or the assessment of pilot conditions do not support wider deployment, that is stated plainly.

The situation this addresses is one where the pressure to proceed often outpaces the basis for it.

The situation this is suited to

A favourable pilot report, and the question of what to do with it

The report

The supplier's pilot shows promising figures

The report presents numbers that make the case for wider deployment. The question that follows — whether those numbers would hold under ordinary operating conditions — is one the supplier has a commercial interest in not examining too closely.

The gap

Pilot conditions and operational conditions are rarely the same

Pilots are often run on a selected subset of traffic, with additional attention from supplier staff, and over a period that avoids the seasonal or volume peaks that full-scale operation would encounter regularly.

The cost

Full-scale costs are often not shown in pilot reports

Running costs at scale — licensing, maintenance, staff time for oversight, and the load on existing systems — are frequently not addressed in pilot reports, or are addressed in terms that make them appear smaller than they will be in practice.

The approach is to examine what the pilot actually measured — and what it did not.

How the evaluation works

We examine what the pilot measured against what full-scale operation requires

The evaluation sits between the supplier's pilot report and your organisation's deployment decision. It examines the gap between those two points — looking at measurement method, representativeness of pilot conditions, and cost at scale.

Join diagram — Pilot Evaluation Engagement

Supplier pilot report
Figures and claims
Method review
Measurement method
What was counted
Recalculate →
Orb Lab Mesh assessment
Independent review point
Figures →
Operational scale
Real conditions

The orange node marks the independent review point — where the method is examined and the figures are recalculated before a recommendation is formed.

What the evaluation examines

  • The measurement method used in the pilot — what was included and what was excluded
  • Whether pilot conditions resembled ordinary operation in volume, scope, and edge cases
  • Figures recalculated at full operational scale using realistic assumptions
  • Running cost at scale — including licensing, maintenance, and oversight requirements
  • Whether the result supports wider deployment, or whether discontinuing is the more defensible conclusion

What you bring to the engagement

The evaluation works from the pilot documentation you hold — the report, the measurement data, and any agreement terms or running cost figures provided by the supplier. You do not need to produce additional data; the evaluation examines what already exists.

We may ask questions of the staff who were involved in the pilot period, to understand how closely pilot conditions matched the ordinary operating environment.

Three weeks is sufficient for a thorough evaluation — it is also deliberately bounded.

What three weeks looks like

Document review, recalculation, and written output

Week 1

Document review and method assessment

We review the pilot documentation — the report, measurement data, and supplier-provided cost figures. The measurement method is assessed: what it counted, how it counted it, and where the approach introduces optimistic bias.

Week 2

Scale recalculation and cost modelling

The pilot figures are recalculated using operational-scale assumptions — realistic volume, load variation, and the edge cases that full deployment would introduce. Running cost is modelled separately from the supplier's projection.

Week 3

Written output and recommendation

Findings are compiled into a written document covering the method assessment, recalculated figures, and a recommendation. The recommendation may support wider deployment, recommend further investigation, or recommend discontinuing.

The investment is the smallest of the three services — the scope is bounded by what a pilot already produced.

Investment

Three weeks, one price, one written output

Pilot Evaluation Engagement

¥29,000 JPY

Three-week engagement · Single payment

The fee covers the full three-week evaluation — document review, method assessment, scale recalculation, cost modelling, and the written output with recommendation. There are no add-ons and no expectation of further work.

A recommendation to discontinue is covered by the same fee as any other conclusion. We do not adjust the output based on what outcome would be commercially convenient for either party.

What is included

  • Assessment of the measurement method used in the pilot
  • Review of whether pilot conditions resembled ordinary operation
  • Figures recalculated at operational scale
  • Running cost modelled at full scale, independently of supplier projections
  • Written recommendation — which may be to discontinue
  • Written output delivered as a document your team can use independently

The evaluation methodology is designed to surface the specific ways pilot reports tend to overstate results.

How the work is conducted

Three patterns that produce optimistic pilot figures — and how we address each

Selected traffic

Pilots are often run on the cleaner, more representative subset of incoming cases — excluding the ambiguous, unusual, or high-stakes examples that full operation would include. We examine what was excluded and model its effect on performance.

Supplier attention during the pilot period

Suppliers typically assign additional staff to pilot engagements. The results reflect that attention — which is not a resource that continues at full-scale deployment. We note where this effect is likely to be present.

Costs not counted in the pilot

Ongoing maintenance, staff time for oversight, and the incremental load placed on existing systems are frequently absent from pilot cost figures. These are recalculated separately and included in the full-scale assessment.

Data handling — this engagement

Processing:Within Japan. Pilot documentation reviewed only by Orb Lab Mesh staff directly involved in the engagement.
Retention:Working documents held for the engagement period plus 30 days.
Deletion:Confirmed in writing upon request at close of engagement.

What to expect as outcomes

A clear account of what the pilot actually showed

The method assessment gives you a documented understanding of what the pilot's figures are based on — one that is independent of the supplier's account of them.

Recalculated figures at operational scale

The deployment decision can be made against numbers that reflect how the system would actually run — not how it performed under pilot conditions. These figures may be higher or lower than what the report shows.

A written recommendation you can act on

The recommendation is written in plain terms and does not hedge toward a particular outcome. If the figures support deployment, that is stated. If they do not, that is stated with equal clarity.

A short conversation is enough to establish whether this engagement is suited to what you are holding.

Our commitment

What we stand behind

No commercial relationship with suppliers

Orb Lab Mesh has no commercial relationship with the suppliers whose pilots we evaluate. The assessment is not influenced by any party other than the organisation that engaged us.

Written output, always

The evaluation will produce a written document — not a verbal summary or a slide presentation. The findings and recommendation stay with you in a form that can be shared, referenced, and used independently.

An initial conversation at no charge

If you would like to discuss your pilot situation and whether this engagement would be suited to it, the initial conversation carries no charge and no expectation of proceeding.

Getting started requires only a message — the next steps are straightforward from there.

How to begin

From your pilot documentation to a written recommendation

Step 01

Send a message

Use the contact form or email us at info@orb-labmesh.com. A brief description of the pilot — what the supplier has provided, what decision you are facing, and when you would need a recommendation — is enough to start.

Step 02

Initial conversation

We will respond within two business days to schedule a short conversation. This is where we establish what documentation is available and whether the evaluation would produce something useful for your situation.

Step 03

Evaluation begins

If both sides agree to proceed, you provide the pilot documentation and we agree on a start date. The three-week period begins from the point at which the documentation is in hand.

Two other services may suit a different stage or a different aspect of the same decision.

Other services

If a different engagement fits your situation

¥40,000 JPY — 5 weeks

Integration Architecture Review

A structured assessment of how a newly introduced tool would sit alongside your existing systems — covering data flow, permission boundaries, points of failure, and the maintenance each connection would require.

¥35,000 JPY — 7 weeks

Email and Correspondence Handling

Setting up assisted handling of high-volume incoming correspondence — classification, routing, and reply drafting — with a human review step retained before anything leaves the organisation.

Pilot Evaluation Engagement

An independent view of what your pilot actually showed

If you are holding a supplier pilot report and would like an independent assessment of what it means for a deployment decision, a conversation is a reasonable place to begin.

Start a conversation